The Stuart Clan 2008

The Stuart Clan 2008
Tom and Davina with his 4 children and the grandbaby

Sunday, September 19, 2010

Holding patterns...

First, an update. Turns out Gaia often breaks into random tears over potty training (I chatted with her mom about it.) So it wasn't just me, yay! And she's always a picky eater. Hubby and her mom said that if she wouldn't eat anything, then I should just let her go until the next meal.. I have such a hard time with that, though, but she was pretty good about eating the rest of her time with us.
Now on to the new stuff. We're in a holding pattern again.. Just when we were posed to finish up or first round of paperwork and application, we are waiting. Hopefully we can still get the things done soon, but for now, we wait. Tom has heard rumors of possible lay offs coming at work, so we are waiting to see where that is going. He's already actually been offered another job, though it would be a cut in pay and is temporary (though we don't yet know how long that would last..) but it would be something to get us through if we needed it. We just don't know if he needs it yet. They are hoping to know one way or the other sometime next month, and either way should have work through til the end of the year. We just would hate to jump ship if lay offs aren't coming for him and they are going to extend their contract or something. For now though, at least until next month, we wait and see and save our pennies, just in case. We've been very lucky in this economy to not have been hit too badly. Really hoping our luck holds. :)
Emotionally, it's been rather draining on me.. Just had my birthday earlier this month. Is it really sad that the only thing I wanted this year was to have our fingerprints taken? I've been keeping myself busy though. We're moving the older girls downstairs for the next year or so while we do some renovations upstairs. We've got to move out of the master bed and bath while we do some work in there. (After the mold in the hall bathroom this past February, we suspect the little old man who built this house maybe didn't use the right stuff in any of the other bathrooms, either, so we are going to be taking them apart one at a time and fixing that, hopefully before there's anywhere near the problem there was in the hall bath.) And we'll be moving into their room while we do the work, because, well, there's no way I could live/sleep in a construction zone :) and we need to replace flooring in our room anyway. Once we ever get done there (which will be a while due to costs and the fact that we're doing it ourselves on the weeks hubby's home, so it will be an on again/off again project.. I'm figuring 1.5-2 years before everything is done upstairs..) we'll replace the flooring in the girls' room before moving them back up.
So I've been moving their stuff down and getting that all set up. Am actually mostly done with that, just a few more bits and pieces and one dresser to move this week. Then just have the finishing of set up downstairs. Then cleaning up and seriously cleaning the carpet before starting the moving of our stuff into their room.
The nursery is also more or less set up at the moment. Mostly it's set up as toddler zone for the grand baby, but would be easy to convert back to infant mode when needed.
And just got buzzed. B1 is coming over to pick up some things, so I'd better sign off for now and get a few things ready to go.

No comments:

Post a Comment